INVESTING
AEP's $100 Billion Plan and the Rate-Base Math Behind It
AEP's $100 billion plan nearly doubles its rate base by 2031 β and the arithmetic of who pays for it is the story.
Power, markets, flexible RA,and the money behind the grid
Topic
111 stories on this topic, across the desks.
INVESTING
AEP's $100 billion plan nearly doubles its rate base by 2031 β and the arithmetic of who pays for it is the story.
DATA
Two weeks after the first $1.7 billion agreement under TVA's Capacity Commitment Charge, the tariff's real test is not whether developers will sign β it is what the money buys, and who pays if the load never arrives.
INVESTING
CenterPoint Energy raised its ten-year capital plan to $70.7 billion and extended its earnings growth outlook through 2030, completing an earnings season in which five utilities announced roughly $342 billion of planned spending β and leaving one question for investors: what happens if the load arrives slower than the capex?
MARKETS
EIA's November outlook has commercial electricity sales passing residential sales for the first time in 2026, and the bill for the load that drove the crossover is already landing unevenly.
DATA
A November 25 analysis graded 22.5 gigawatts of hyperscaler power agreements and found that nearly half is output from plants already running, most of the rest is reactors that do not exist yet, and only about 1.8 gigawatts is new supply with a dated path to the grid before 2030.
GRID
The six grid operators have all answered FERC. Most of the new tariffs would take effect in early 2027 β but the services developers actually want do not arrive until 2028 or 2029.
INVESTING
Investors spent the fall pricing the utilities' $70β85 billion capital plans; the suppliers' order books are now the check on whether that build is real β 122 gigawatts of reserved gas turbines, a 900-megawatt fuel-cell deal, and a record year of generation behind them.
MARKETS
Eight consumer-advocate offices asked PJM's board for a written answer by November 23 on postponing the December capacity auction; as of this morning there is still no public answer, and with the auction opening December 9 the only remaining off-ramps are a FERC filing or the auction itself.
DATA
Applied Digital's new 150 MW, 18-year hyperscaler lease lifts its contracted revenue past $41 billion β but the tenant is unnamed, delivery is 2028, and the power agreements are still to come.
INVESTING
Bloomberg reported on November 20 that KKR's Helix is in talks to buy a majority stake in EdgeCore at an $8β10 billion valuation β the third big private-capital data center move in a month, and a price for power-secured sites rather than servers.
MARKETS
Enverus Intelligence Research's winter outlook for ERCOT and SPP says Texas winter is event-driven, the difference between a cheap day and a ruinous one comes down to wind, and a record El NiΓ±o makes January the month that matters.
DATA
Fermi's hyperscaler put $200 million down before signing a lease, and the market named the customer Amazon β but the money is an unsecured bet on a pre-revenue developer, and the December 31 deadlines have not moved.
GRID
SPP's board approved the largest transmission portfolio in its history β a 765-kV backbone built for load growth that arrives faster than the lines do.
MARKETS
Eight consumer-advocate offices asked PJM's board for a written answer by today on postponing the December capacity auction; as of this morning there is no public answer, and the final planning parameters due November 19 have not visibly altered the demand curve the auction will clear against.
DATA
Blackstone's new data center REIT is buying 647 MW of finished, Amazon-leased powered shells at a 7.0% cap rate β a price that tells the market what power certainty and hyperscaler credit are worth.
GRID
PJM's November 16 filing would make large computational loads ride through routine transmission faults instead of transferring to backup β and unlike other regions, it gives the 10 gigawatts already running no exemption.
INVESTING
Xcel Energy's $70 billion five-year capital plan is one of the largest regulated buildouts of the season β and its most interesting feature is what it does not depend on: the base plan stands on existing customer needs, leaving the data-center bet in a $10 billion layer of optionality on top.
MARKETS
At its November 5 briefing, ERCOT told Texas regulators that nearly 10 GW of medium-size load is seeking utility connections, concentrated just below the 75 MW line that triggers its review β and it has sent 132 requests to utilities to find out whether any of it was shrunk on purpose.
DATA
Black Hills will build 564 MW of new gas generation and manage 2.1 GW of third-party resources for Google's planned Cheyenne data center β the bring-your-own-power model, delivered as a 22-year utility contract.
GRID
At its November 19 open meeting, FERC authorized the affiliate sales behind NIPSCO's data-center buildout and sustained the incentives for a $1.7 billion transmission line β while sending New England transmission owners to hearing over the employee bonuses in their rates.
INVESTING
Southern Company's third quarter turned the data-center load wave into a 21% earnings jump, a guidance raise, and a capital plan that now runs to roughly $85 billion β and the question for investors is whether the load arrives on schedule or the bill lands on ratepayers.
MARKETS
Eight ratepayer-advocate offices in seven states joined PJM's market monitor on Wednesday in asking the grid operator's board to postpone the 2029/30 capacity auction until data-center load is stripped from the forecast β arguing the auction would otherwise price load that may never arrive, at an estimated $5β10 billion to consumers.
DATA
A 33-megawatt geothermal block in Utah reached commercial operation on September 30, and Google's 396-megawatt contract makes the earth's heat the newest firm-power option in the data center playbook.
GRID
Southwest Power Pool's response to FERC's large-load show-cause order is due today, completing the six-operator set β and unlike the other five, SPP is mostly defending a framework FERC has already accepted.
MARKETS
FERC granted PJM's request for more time to answer Exelon's complaint seeking a prompt capacity auction, setting a December 21 deadline that leaves the Commission about six weeks to rule by the January 31 date Exelon asked for β and the merits have not been briefed at all.
DATA
The Oregon commission approved Pacific Power's large-load tariff on November 13, and the state's own ratepayer advocate calls it the toughest such deal a for-profit utility has agreed to under the POWER Act.
GRID
CAISO's November 16 filing, docket ER27-532, carries the board-approved framework to FERC β but the new substance is in the operating requirements, the metering rules, and the half of the answer that lives in the utilities' own tariffs.
INVESTING
Six months after the May announcement, the largest regulated-utility merger in American history opened its decisive hearing in Richmond on Tuesday β and Virginia's governor wants $6.52 billion back before it closes.
MARKETS
E3's second-edition 2026 Core Case maps three decades of hourly prices across North America's wholesale markets β and its most consequential finding is not a price level, but a migration of scarcity itself.
DATA
Fermi America landed a $200 million hyperscaler prepayment for 600 megawatts at Project Matador β but the lease is still a nonbinding letter of intent, the first tenant is gone, and the reactors are further away than ever.
GRID
The November 16 filings are in β five operators, five tariff proposals, and a common answer to FERC: connect early on flexible service, pay your own way, and convert to firm when the wires are ready.
INVESTING
Ameren, DTE Energy, and Consolidated Edison all reported third-quarter results on November 5, and each answered the same question β how to pay for the load-growth buildout β differently: Ameren by raising its growth rate, DTE by selling a business, and ConEd by narrowing the guide.
MARKETS
ERCOT's audit and community-impact reports land December 10, and 17 loads carrying 6,608 MW of peak demand are waiting at the last gate before power β in a queue that asked for five times the state's record peak.
DATA
Howden's new research puts the mismatch in one ratio β data center power demand has grown about ten times faster than grid capacity since 2000 β and the behind-the-meter math for closing it does not add up.
GRID
Five grid operators owed FERC their large-load answers on November 16, and the filings in public view converge on the same bargain β connect early on available capacity, accept curtailment, and graduate to firm service β while SPP, due Friday, already has the template.
MARKETS
Monitoring Analytics' January-through-September report finds PJM's energy market competitive even as the real-time price rose to $74.98 per MWh β driven most of all by transmission constraints, with congestion revenue up 120 percent and only 72.8 percent of it returned to customers.
DATA
Constellation's first Peak+ transaction pairs 270 megawatts of unit-contingent nuclear output with new capacity and demand response β the hyperscaler contract is now being negotiated hour by hour, not just megawatt-hour by megawatt-hour.
GRID
Grid Strategies found that the data center load in utility forecasts filed with FERC runs about 40 percent above credible industry projections β and the filings due at FERC today will show whether the grid operators intend to plan on the inflated number or the real one.
INVESTING
Third-quarter earnings rose on record Arizona demand and guidance jumped by half a dollar, but the quarter's real test is the TSMC contract filed three days later β and a commission that just changed its makeup.
DATA
Six weeks after TVA's new data center tariff took effect, an unnamed customer has signed the first disclosed Capacity Commitment Charge agreement β $1.7 billion in aggregate payments that turns the who-pays argument into a real contract.
INVESTING
Duke Energy's third quarter delivered the strongest load growth since 2022, a beat on both lines, and guidance narrowed to the top β and behind it a $103 billion capital plan and a 16-gigawatt generation build that will decide whether the growth converts into earnings.
MARKETS
Monitoring Analytics' January-through-September State of the Market report finds PJM's energy market competitive, its last four capacity auctions not competitive β and says the December auction, not the next election, is where the $29.4 billion data-center capacity bill grows next.
DATA
FirstEnergy's third quarter delivered an earnings beat and a contract book up 90 percent since January β and a June petition to FERC that would make data centers, not ratepayers, fund the transmission their load requires.
GRID
NERC's cold-weather data shows 99 percent of winter capacity can operate at extreme cold temperatures, and the January Arctic storms proved the preparation works β but corrective action plans still hang open, and demand keeps rising into every margin the grid has bought.
INVESTING
NRG beat third-quarter estimates by a wide margin on the LS Power portfolio and Eastern capacity prices, then agreed to sell 4.9 gigawatts back to LS Power for $4 billion β a merchant generator choosing discipline over scale at the top of the cycle.
MARKETS
At Friday's workshop, PJM will weigh three reform pathways β stabilize the capacity market, ration reliability, or rebuild around energy and ancillary services β with the December auction, a FERC complaint, and a May deadline all converging on the same question.
DATA
Southern Company's third quarter delivered the sharpest data-center demand numbers in the sector β and a contract book that will take until the mid-2030s to fully arrive, testing whether generation, transmission, and gas can keep pace.
INVESTING
Adjusted earnings rose 26% on Oncor's new base rates and trackers while California was essentially flat after tax and interest offsets, and a proposed CPUC decision now puts Sempra's 2027 guidance in the lower half unless it is corrected.
MARKETS
The Board's October 26 adoption of three new computational-load standards and two facility-interconnection revisions moves the reliability half of the large-load response into FERC's hands β with a December 31 filing deadline, a November 20 comment date, and years of phased compliance still ahead.
DATA
Evergy's third-quarter beat was mostly weather, but the durable news is signed load: three ESA amendments worth about 250 MW and a letter of intent with Digital Realty for a 1.4 GW expansion in Kansas.
GRID
PJM's proposed Fast Energization design would collapse generation interconnection, merchant transmission interconnection, and firm large-load transmission service into a single 12-month annual process β a study-process answer to the load-growth problem, but still a proposal, not a tariff.
MARKETS
The refiled March procurement still carries a $555/MW-day ceiling and 15-year terms, but utilities' lowered load forecasts have cut the gap it was designed to fill by more than nine-tenths β and Exelon's new complaint asks whether the three-year auction that created the gap should exist at all.
DATA
PPL's Invitium joint venture will build dedicated generation for a QTS campus in Salem Township β the utility-owned model for hyperscaler load, arriving in the PJM territory where the capacity shortfall is most acute.
INVESTING
A bitcoin miner is becoming an AI infrastructure landlord β and the fine print of its Corsicana lease shows exactly what that transformation costs.
DATA
On November 3, voters in at least 38 jurisdictions approved bans or restrictions on data centers β and the pipeline risk now runs through 2028, not 2027.
GRID
NCCETC counted 497 state actions on power decarbonization and resource planning in Q3 β and the dominant story is large load moving from the tariff docket into the integrated resource plan.
DATA
Retired aircraft turbines are becoming the fastest route to power for AI campuses that cannot wait years for a grid connection.
INVESTING
Regulated earnings surged, a nonregulated write-down landed, and Virginia's evidentiary hearing on the NextEra deal opens in twelve days.
MARKETS
Exelon's November 4 complaint in docket EL27-11 asks FERC to order a prompt capacity auction two months before delivery, arguing the three-year-forward auction locks in high costs on forecasts that keep proving wrong β but the filing names no first delivery year and no transition, and FERC has not ruled.
GRID
California's grid operator approved a deal that lets 50-megawatt loads connect before their upgrades are built β if they accept being curtailed until the wires catch up.
INVESTING
Entergy beat consensus, raised the bottom of its 2026 guidance range, and added $1.5 billion to its capital plan β but $0.18 of the year-over-year gain came from weather, so the quarter's real test is how much of the load growth survives a normal summer.
MARKETS
Charles River Associates' independent forecast sees PJM data-center demand reaching 30 GW by 2030 with an 11.5 GW gap to what can be powered at 1-in-10 reliability, while utilities' lowered near-term forecasts could shrink the refiled backstop from 6.8 GW to roughly 630 MW β and both answers feed the same December auction and March procurement.
DATA
OpenAI promises its future campuses will cut demand when grids are strained, starting with up to 1,000 megawatts in Georgia β but the public terms do not yet say how fast, how long, or how often.
DATA
A proposed Senate bill would require data centers to pay both embedded and incremental transmission costs, and a new Grid Strategies analysis puts the tab at $55 billion over ten years.
GRID
The October 30 application would rebuild about 29 miles of 138-kV lines in three Virginia counties and add 500-kV circuits to existing corridors β the Virginia leg of a project PJM awarded in 2023 that would not enter service until December 2030.
MARKETS
PJM's compliance filing, due this week, strips the rejected curtailment and capacity rules out of its tariff and leaves behind a database β one that will shape how the grid operator sees, forecasts, and plans for every load of 50 MW or more.
DATA
Louisiana voters choose two Public Service Commissioners on November 3, weeks before the current commission votes on seven more gas plants for Meta's 5-gigawatt Richland Parish campus β and the winners will inherit the fast-track rules and cost-allocation questions the December vote leaves behind.
GRID
On November 16 and 20, the six grid operators must answer FERC's challenge to their large-load rules β and the filings will set the terms on which data centers connect and who pays if they do not.
INVESTING
Exelon beat consensus and narrowed guidance on the strength of approved rates, then pointed to $12β17 billion of transmission and $3β7 billion of storage beyond its $41.7 billion plan β upside that only becomes rate base if regulators and grid planners say yes.
MARKETS
PJM's October 29 amended Reliability Backstop Procurement ties costs to each zone's large-load growth, cuts load-serving-entity collateral, and removes the co-op and municipal opt-out β but the 6,831 MW shortfall it was built to fill will be recalculated before a single bid is taken.
DATA
Attorney General Dana Nessel's rehearing petition argues the MPSC's conditional approval of DTE's 20-year Google contracts lets projected long-term benefits excuse real cost-shifting in 2035β2038 β and asks whether a take-or-pay floor is enough when the bill arrives a decade from now.
INVESTING
A 42% jump in quarterly net income came with a bigger story: a mid-size Midwest utility raising its four-year capital plan by nearly a fifth on the strength of 3.4 GW of contracted data-center demand.
DATA
The Information Technology Industry Council's voluntary pledges promise that new data centers will bring their own power and pay their own way β but pledges are not tariffs, and the binding fights are still being decided state by state.
INVESTING
GE Vernova booked $29.3 billion of orders in a single quarter, lifted its backlog to a record $197 billion, and agreed the same day to buy high-voltage equipment maker Trench Group for $9 billion β a deal that treats grid components, not generation, as the scarce asset.
DATA
Venture Global's frame agreements for up to 16 gas power islands put a number on bring-your-own-power β and that number will decide whether the model scales or stalls.
GRID
American Electric Power's expanded five-year plan finally gives the transmission buildout a figure sized to the load it must serve β but money alone does not clear the permitting, equipment, and cost-allocation constraints that have throttled the wires for a decade.
INVESTING
FirstEnergy beat consensus by eight cents and reaffirmed guidance toward the high end of its growth range β but the number that matters most is 7.9 gigawatts of contracted large-load demand, and whether it becomes rate base on schedule.
DATA
The IURC's unanimous approval of AES Indiana's plan to serve Google's 390 MW Monrovia campus is the first test of the state's 2025 large-load law β and it sits alongside two very different Indiana models for making a hyperscaler pay.
GRID
Stack Infrastructure's 21-building campus at Berry Hill is sold as a 3,000-MW project, but the deal turns on a far smaller number: 299 MW of grid power by the end of 2028.
INVESTING
CBRE will pay up to $1 billion for Onnec, betting that the scarce resource in the data-center buildout is no longer capital or power, but the crews that install the infrastructure on time, identically, everywhere.
MARKETS
EIA's October outlook makes PJM the steepest regional mover in both directions β and the first-half record shows why an annual average is a poor guide to what any buyer will actually pay.
DATA
A 434-mile pipeline to the Texas Panhandle, anchored by an unnamed hyperscaler, shows that fuel supply has become data-center infrastructure β and that the anchor tenant now drives pipeline investment decisions.
INVESTING
Louisiana's regulators just authorized $2 million of nuclear exploration β and Entergy's CEO has said plainly that actual reactors need industrial or federal money, which makes the who-pays question the whole story.
DATA
The largest loan in Rural Utilities Service history finances a gas plant built for co-op members β and lands in the middle of the fight over who pays for data-center growth.
INVESTING
Adjusted EPS of $1.24 beat consensus and management pointed at the high end of guidance β days after Virginia's governor filed for a six-year rate freeze and SCC staff reportedly urged denial of the Dominion merger as currently proposed.
DATA
Google is paying Voltus to assemble more than a gigawatt of batteries, thermostats, and industrial curtailment across PJM through 2040 β capacity that exists only when the grid calls for it.
INVESTING
A $6 billion fund closed at its hard cap in six months, with $1.7 billion already committed toward a 5 GW gas-fired platform anchored by pending Constellation acquisitions, is the clearest price signal yet of where sophisticated money expects returns: existing firm capacity, contracted load, and transmission.
DATA
The president's October 21 Truth Social demand that new large data centers generate their own power arrived with no executive order or rule behind it β but the generation math, the export problem, and the community-payment trend it points to are all real.
INVESTING
Analysts expect 7.0% sector earnings growth against the hottest September on record β what investors should listen for as utilities report.
DATA
NiSource's 20-year, ~1,100 MW Microsoft agreement makes the hyperscaler pay for its own infrastructure while claiming $1.75 billion in lifetime savings for existing NIPSCO customers β the industry's emerging template, now running on a GenCo chassis.
INVESTING
Two contracts β 890 MW of new uprate capacity on a 20-year PPA and 2,700 MW of existing output on a 15-year deal β turn Constellation's merchant nuclear fleet into an equity growth story: contract-anchored capex in the tightest large power market in the country.
DATA
On October 15, Harris County's attorney quoted CenterPoint's own load forecast back at the utility β 8 GW of new data-center load by 2029 β and asked the legislature for county authority over what connects and where.
INVESTING
Two announcements in two days put a regulated utility behind up to 2.3 GW of on-site generation β one deal contracted to Google, the other with no disclosed offtaker β and the difference between them is the story.
INVESTING
Generac's Amazon agreement pairs $2.4 billion in expected generator deliveries with a purchase-linked warrant β a residential-generator company selling its way into contracted data-center infrastructure, with dilution that arrives only alongside revenue.
DATA
A year after DTE announced its first hyperscaler contract without naming the customer, the deal has a name, a site, regulatory approval, and a second hyperscaler following behind it.
INVESTING
A $1.8 billion gas build, a 2.1 GW private microgrid, and a 22-year contract with one customer reshape a dividend stalwart's earnings profile.
MARKETS
PJM's market monitor calculates that data center load added $29.4 billion in capacity costs across four auctions β and that 4,017 MW of the forecast load behind those costs has already been canceled or delayed.
DATA
The amended Kentucky Power agreement gives the Muskie Data Campus 1 GW on paper β but the second 500 MW still needs regulator approval, and the first electron is years away.
INVESTING
NextEra's $66.8 billion all-stock deal for Dominion would create the world's largest regulated electric utility β if Virginia lets it.
DATA
ERCOT was tracking roughly 474 GW of large-load requests β about 90 percent data centers, more than five times the state's record peak β so Texas stopped approving new connections and started verifying which projects are real.
GRID
Months before FERC rejected PJM's curtailment framework, it accepted SPP's conditional transmission service β a voluntary, transmission-based bargain that lets large loads connect fast and be interrupted when the wires bind.
MARKETS
PJM wanted new large loads to bring their own capacity or be curtailed first in emergencies. FERC rejected the mechanism on jurisdictional grounds β leaving state prepayments and a capacity market pinned at its cap to carry the cost.
DATA
PJM's market monitor says 4,016.9 MW of forecast data center load was canceled or delayed β and if it is right, the grid's capacity gap is less than half what PJM claimed.
GRID
MISO wants FERC to let it study very large loads and their paired generation together in 120 days β in exchange for a 15-year lock that turns a connection request into a long-term commitment.
DATA
TVA's new data center rate charges new and expanded loads above 5 MW roughly $1.5 million per megawatt to reserve capacity β and one small Mississippi site shows how much timing matters.
DATA
Duke Energy's settlement with the North Carolina Public Staff makes large loads pay upfront β cost allocation in practice, with the clean-supply question conspicuously deferred.
DATA
Google will underwrite 890 megawatts of nuclear uprates at eleven existing reactors β the fastest credible path to the firm, carbon-free power its AI buildout demands.
GRID
EIA's October outlook projects record U.S. electricity consumption of 4,288 terawatt-hours in 2026 β and every resource-adequacy calculation in the country sits downstream of that number.
INVESTING
Hyperscale load is turning electricity supply into contracted infrastructure β how investors underwrite the electrons behind the cloud.
DATA
Training an AI model and running it are different computing tasks β and they draw power in very different ways.
DATA
After two decades of flat demand, the U.S. grid is growing again β and data centers are the driving force.